Software Features and Description
1. Use the Oracle Primavera Field for iOS app to access critical information and provide status updates for the projects that your organization manages with Oracle Primavera.
2. Note: For full functionality, a current license and connection to Oracle Primavera are required.
3. Streamline processes and reporting, identify and resolve issues quickly and effectively, collaborate with your team, and manage your project drawings with one easy to use app.
4. Liked Oracle Primavera Field? here are 5 Business apps like Oracle Primavera Unifier; Oracle Primavera P6 EPPM; Oracle Primavera Cloud; Oracle Transportation Mobile;
Download and install Oracle Primavera Field on your computer
Hurray! Seems an app like oracle primavera field is available for Windows! Download below:
SN |
App |
Download |
Review |
Maker |
1 |
ORACLE LATISTA Field Management
|
Download |
4/5
10 Reviews
4
|
Oracle Corporation |
2 |
Oracle Mobile Authenticator
|
Download |
4/5
7 Reviews
4
|
Oracle America Inc |
3 |
Oracle MWM
|
Download |
5/5
0 Reviews
5
|
Oracle America Inc |
Not satisfied? Check for compatible PC Apps or Alternatives
Or follow the guide below to use on PC:
Select Windows version:
- Windows 7-10
- Windows 11
Download and install the Oracle Primavera Field app on your Windows 10,8,7 or Mac in 4 simple steps below:
- Download an Android emulator for PC and Mac:
Get either Bluestacks or the Nox App >> . We recommend Bluestacks because you can easily find solutions online if you run into problems while using it. Download Bluestacks Pc or Mac software Here >> .
- Install the emulator on your PC or Mac:
On your computer, goto the Downloads folder » click to install Bluestacks.exe or Nox.exe » Accept the License Agreements » Follow the on-screen prompts to complete installation.
- Using Oracle Primavera Field on PC [Windows 7/ 8/8.1/ 10/ 11]:
- Open the Emulator app you installed » goto its search bar and search "Oracle Primavera Field"
- The search will reveal the Oracle Primavera Field app icon. Open, then click "Install".
- Once Oracle Primavera Field is downloaded inside the emulator, locate/click the "All apps" icon to access a page containing all your installed applications including Oracle Primavera Field.
- Now enjoy Oracle Primavera Field on PC.
- Using Oracle Primavera Field on Mac OS:
Install Oracle Primavera Field on your Mac using the same steps for Windows OS above.
How to download and use Oracle Primavera Field App on Windows 11
To get Oracle Primavera Field on Windows 11, check if there's a native Oracle Primavera Field Windows app here » ». If none, follow the steps below:
- Download the Amazon-Appstore » (U.S only)
- Click on "Get" to begin installation. It also automatically installs Windows Subsystem for Android.
- After installation, Goto Windows Start Menu or Apps list » Open the Amazon Appstore » Login (with Amazon account)
- For non-U.S users, Download the OpenPC software »
- Upon installation, open OpenPC app » goto Playstore on PC » click Configure_Download. This will auto-download Google Play Store on your Windows 11.
- Installing Oracle Primavera Field:
- Login to your computer's PlayStore or Amazon AppStore.
- Search for "Oracle Primavera Field" » Click "Install" to install Oracle Primavera Field
- Oracle Primavera Field will now be available on your windows start-menu.
Minimum requirements |
Recommended |
- 8GB RAM
- SSD Storage
- Processor: Intel Core i3, AMD Ryzen 3000
- Architecture: x64 or ARM64
|
|
Oracle Primavera Field On iTunes
Download |
Developer |
Rating |
Score |
Current version |
Adult Ranking |
Free On iTunes |
Oracle America, Inc. |
2 |
5 |
19.6.6 |
4+ |
Download on Android: Download Android