Last Updated by Oracle America, Inc. on 2025-05-16
1. • Measures that quantitatively evaluate portfolio performance over time by comparing actual values against their targets.
2. Use the Oracle Primavera Portfolios app to monitor the health and performance of your project portfolios.
3. • Powerful dashboards to quickly gain insight into portfolio performance using a wide range of key performance indicators.
4. Note: For full functionality, a current license and connection to Oracle Primavera Cloud are required.
5. The app includes a demo mode that enables you to evaluate the app without a license or connection.
6. • View files related to your portfolios and save them for offline access.
7. • Discussions to collaborate with peers while on the go.
8. Liked Oracle Primavera Portfolios? here are 5 Business apps like Oracle Primavera P6 EPPM; Oracle Primavera Unifier; Oracle Primavera Field; Oracle Primavera Cloud; Oracle Beehive Mobile Communicator;
GET Compatible PC App
App | Download | Rating | Maker |
---|---|---|---|
![]() |
Get App ↲ | 0 1 |
Oracle America, Inc. |
Or follow the guide below to use on PC:
Select Windows version:
Install Oracle Primavera Portfolios app on your Windows in 4 steps below:
Download a Compatible APK for PC
Download | Developer | Rating | Current version |
---|---|---|---|
Get APK for PC → | Oracle America, Inc. | 1 | 19.6.0 |
Get Oracle Primavera Portfolios on Apple macOS
Download | Developer | Reviews | Rating |
---|---|---|---|
Get Free on Mac | Oracle America, Inc. | 0 | 1 |
Download on Android: Download Android